I had an idea early this morning about the layout but am not on the right computer to do the editing so you will have to refer to my previous post for the diagram and this description of my changes:
There is a turnout in grid G1 that will be moved to grid I2 instead, and that track will follow the current curve. A second curve will get laid inside the existing curve so that the yellow section can still have a conituous run loop. The diverging track will immediately begin a grade to place it high enough to run directly above the other mainline through the closet, so that less space in the closet will get used by tracks.. The orange layout section's track plan wont look any different aside of the fact that the continuous loop on it will become a helix instead. This will give me more room on the orange layout for a large mountain and will also give me more tunnel portal options I think. May or may not be a good idea but it's just a thought at this stage, tell me what you think of it.
I'll edit the map when I get back to my own computer.
Mike, from DC.
Tuesday, February 19, 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment